logo

k-deck aluminium slab formwork with Early Stripping Drop Head

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Good Formwork for Homes| Concrete Construction

The slabs are poured using the MevaDec slab formwork and applying the drop-head-beam-panel method- The drop head allows for early stripping, the props remain under the poured slabs while the panels and beams can be removed early for the next slab- Thus the site needs two sets of props but only one set of panels and beams to do the entire slab jobs-

Tiltup Climbing Formwork - Using Aluminium Section - Actech

Advanced Concrete Technologies - One stop shop for for all your precast requirements!

Good Formwork for Homes| Concrete Construction

The slabs are poured using the MevaDec slab formwork and applying the drop-head-beam-panel method. The drop head allows for early stripping_ the props remain under the poured slabs while the panels and beams can be removed early for the next slab. Thus the site needs two sets of props but only one set of panels and beams to do the entire slab jobs.

BEAMDECK The Aluminium Beam Slab Formwork with Drophead for

BEAMDECK Aluminium Beam Slab Formwork 111248 15,700 1134 1200 64 112 1 8 0 111254 8,800 2034 2100 1 8 0 64 112 111108 22,900 2967 3000 64 112 1 8 0 111260 8,440Cross Beam BD 210 For standard fields, Note With integrated timber nailing strip, 1134 1200 64 1 7 5 111284 4,850Cross Beam BD 120 For thicker slabs and filler areas, Note With ,,,

Formwork Wiki - MEVA Formwork

Drop head. Supplementary part for standard props which facilitates lowering supported or suspended beams with just one hammer blow. The lowering of the drop head allows for an early stripping of the beams and slab formwork panels. The head plate of the drop head still supports the slab during the lowering procedure and also afterwards.

Slab formwork MevaDec - MEVA Formwork

The MevaDec drop head (lowers the primary beams and panels by 19 cm) makes early stripping possible. thus allowing optimised material stock on the construction site as well as rapid construction progress. The beams and panels can be stripped effortlessly and used for the next pouring cycle. It is thus possible to complete a slab in three days.

Panel floor formwork Dokadek 30 -

In the ‘Dokadek 30 with drop.head’ method: too: the formwork is set up safely and easily: working from floor.level. The closure panels are then inserted from above: but because these are so narrow (only 15 cm wide) there is no need for any additional fall.hazard precautions.

Solution | Pre-fabricated Slab Formwork System | Construction

A case study was conducted to compare schedules of using traditional formwork and a modified table formwork system [pre-fabricated slab formwork system] on a high-rise project. The results revealed that ".construction schedule was accelerated". when using the modified table formwork system (Kim et al, 2005).

single page max cataloge V1 26 02 16 - Max Aluminium Formwork

Unimax International is an established organization in Aluminium Formwork System serving the construction industry with updated and customized solutions which are environment friendly. An ISO 9001:2008 certified company having two state`of`the`Art manufacturing units each in Sonepat, Haryana as well as